Edikli Solar Power Plant - Technical Information

  • Project, Engineering and Contracting Company: Girişim Elektrik Taahhüt, Ticaret ve Sanayi A.Ş.
     
  • Consultant and Audit Company: ISTRICH Enerji Danışmanlık, İnşaat ve Ticaret LTD.
     
  • Cell Brand: Europower
     
  • Kiosk & Substation: Europower
     
  • PV Panel - Smart Solar - 320 Wp Mono perc: 47.616 pieces
     
  • Solar inverter - Huawei - 185 kW: 60 pieces
     
  • Mechanical construction galvanized iron: 1.240 ton
     
  • Aluminum purlin: 131,5 ton
     
  • Wire fence: High 2 m, 3.500 m
     
  • Lighting pole: High 6 m, 55 pieces, 60 W LED fixture
     
  • Camera: 55 Haikon night vision and 1 Haikon Dom camera
     
  • Energy transmission line / ENH : Connection via 477 MCM line to Yeşilhisar Substation at a distance of 15 km with 70 poles
     
  • DC - PV wire: 267.000 m
     
  • AC wire: 6.600 m
     
  • Transformer: Best, 4 units 2.850 kVA - Hermetic type.
     
  • Main Distribution Board: KVK,  with 4 pieces, 2.500 A switch, fused distribution panel and surge arrester.